To avoid impacts to the transmission system reliability facility interconnection and performance, requirements have been established for all wholesale customers interconnecting to the transmission system (69kV and above) and can be found in the document  Requirements for Transmission System Interconnections for generation, transmission and end-user facilities.

All connections to Cleco's bulk transmission system at 69kV or above must comply with all applicable Cleco transmission standards and the planning standards and measurements of the North American Electric Reliability Corporation (NERC) or its successor, as administered by Midcontinent Independent System Operator (MISO) and or any NERC regional entity.